HOME KOREAN

COMPANY

BUSINESS

토글 메뉴 닫기

We can change the world

We coexist with nature and seek a mutual growth with people.

Railroad

Railroad Department

BUSINESS Railroad

Railroad precision diagnosis for pursuing economic viability and safety in railway operations

We aim to assess and ensure the economic feasibility and safety of railway operations by conducting detailed diagnostics and analysis of the tracks.
Experienced professionals, based on the latest regulations and advanced technologies, take the lead in performing various tasks such as rail track precision diagnosis and performance evaluation with the highest level of technical expertise.

MAJOR SERVICES

Rail track precision diagnosis and performance evaluation field

  • · Track precision diagnosis and performance evaluation services for Banghwa to Hwagok section of Line 5
    · Track precision diagnosis and performance evaluation services for Suwon to Byeongjeom section and 2 other locations on Gyeongbu Line
    · Track precision diagnosis and performance evaluation services for Jihang to Dongducheon section

Track design field

  • · Basic and implementation design for track field of additional stations in Wirye newtown on line 8
    · Implementation design services for track structure improvement of Yongam tunnel between Gwanchon and Imsil stations on Jeolla line
    · Implementation design services for Improvement of high-speed turnout within Geumcheon-gu office station on Gyeongbu line
    · Implementation design services for improvement of bridge and track facilities on lines 3 and 4

MAJOR PROJECTS

Railroad Precision Diagnosis and Performance Evaluation

  • Project name

    Track facility precision diagnosis and performance evaluation for the Banghwa to Hwagok section of line 5

  • Client

    Seoul Metro

  • Period

    Dec. 2022. ~ Apr. 2023.

  • Contents

    · The purpose of this study is to investigate, measure, and evaluate structural safety and
    the cause of defects in track facilities, and to secure track facilities safety and train safety by determining
    the repair scope of track facilities according to the judgment grade

  • Image

Railroad Design

  • Project name

    Implementation design for improvement of high-speed turnout within Geumcheon-gu office station on Gyeongbu line

  • Client

    Korea Railroad Corporation Seoul Headquarters

  • Period

    Nov. 2020. ~ Dec. 2020.

  • Contents

    · Design for ensuring safe operation of trains by improving high-speed lines due to wear and damage to the Geumcheon station high-speed line (Siheung connecting line) of Gyeongbu Line

  • Image