HOME KOREAN

COMPANY

BUSINESS

토글 메뉴 닫기

We can change the world

We coexist with nature and seek a mutual growth with people.

Water Resources Planning

Water Reources Planning Department

BUSINESS Water Resources Planning

“River of Life, Beautiful Rivers”

Water, the source of life, is essential and the most basic resource for human life, so developing and managing water
to be used effectively and systematically is one of the most important things for humans.
We make every effort to make the best harmony between river and human life, such as the development and use of water resources,
prevention and mitigation of various damages caused by rivers, and restoration of river functions.

MAJOR SERVICES

Dimension field

  • ·Comprehensive plan for watershed dimension
    ·Basic river plan
    ·Comprehensive plan for small river maintenance

Field of study

  • · Plan for river maintenance harvest
    · Increase dam capacity

Environmental field

  • · Ecological river creation and river restorationo
    · River environment maintenance
    · Polluted river purification

Disaster Prevention Field

  • · Disaster impact assessment
    · Natural disaster risk improvement project to prevent district and steep slope disaster
    · Comprehensive plan for natural disaster reduction and small river maintenance
    · Reduction countermeasures for spill
    · Analysis and evaluation of disaster recovery
    · Emergency response plan(EAP-wind and flood damage sector)
    · Small-scale safety management

Groundwater field

  • · Integrated groundwater investigation
    · Investigation of groundwater pollution cause
    · Groundwater sharing project in preparation for drought

MAJOR PROJECTS

Basic plan and detail design for river

  • Project name

    Establishment of the basic plan for the river in the downstream area of the Geumho river and preparation of the river facility management ledger

  • Client

    Ministry of Land, Infrastructure and Transport Busan Regional Land Management Office, Korea

  • Period

    Oct. 2013. ~ Jan. 2021.

  • Contents

    - Geumho river and 5 local rivers L=126.26km
    - Investigation and analysis of all matters, such as the flow rate,
     water quality, ecology, and utilization status in the Geumho river and downstream areas;

  • Image

  • Similar project performance

    - Study about influence by opening of Shingok moveable submerged weir
    - Establishment of basic plan for upper Yeongsan river basin and preparation of river management resisters
    - Establishment of basic plan for Andong-dam basin and preparation of river management resisters
    - Establishment of basic plan for Nakdong Milyang, downstream of nakdong river basin and preperation of river management resisters
    - Establishment of basic plan for downstream of Kumho-river basin(modified) and preperation of river management resisters
    - Feasibility study for restoration of Myeonmok underground stream and 1 others
    - Detailed design for improvement work of river environment in Geogok rigion of Imjin river
    - Basic and detailed design for recovery of ecology and furtherance of river friendly culture

Disaster impact assessment

  • Project name

    Fundamental design and implementation of Jungnangcheon ecological recovery and hydrophilic culture development project

  • Client

    Seoul Metropolitan Government, Korea

  • Period

    Jul. 2016. ~ Aug. 2018.

  • Contents

    - Basic and implementation design: Jungnangcheon L=9.8 km
    - Civil engineering: embankment works, shoreline, road maintenance, structures, bridges
    - Landscaping: packaging(walks, squares, etc.)

  • Image

  • Similar project performance

    - Pre-assessment for disaster risk of industrial rental house at southern detention center in Seoul
    - Pre-assessment for disater risk of Sejong-Pocheon (Anseong-Guri) expressway construction, contruction section 10-14
    - Pre-assessment for disaster risk of development of thermoelectric power plant at An-in, Kangnung
    - Pre-assessment for disaster risk of urban development of Hwayang district in Pyeongteak
    - Pre-assessment for Kwangmyeong 5 district house re-built and arrangement project
    - Pre-assessment for disaster risk of Luchen resort construction project

Disaster impact assessment

  • Project name

    Disaster impact assessment on Munsan-Dorasan expressway Construction

  • Client

    Bau Consultant Co., Ltd. and others 7, Korea

  • Period

    May. 2020. ~ Mar. 2022.

  • Contents

    - Scale of development: Munsan to Dorasan L=10.75km
    - Disaster impact prediction and evaluation
    - Establishment of measures to reduce disaster impact and reflection of measures to reduce disaster impact
    - Maintenance plan

  • Image

  • Similar project performance

    - Estimating standards and cost research service for groundwater development and utilization facility construction
    - Detailed status survey of soil, surface water, and groundwater in Seoul research roxad
    - Sharing groundwater project in preparation for drought in Mungyeong and Yeongdeok area