Railway Planning & Design

Railway Planning & Design Department

BUSINESS Railway Planning & Design

“Leading Green Transportation, Pioneer for Leaps in Railway Business”

Our qualified and well experienced engineers are carrying out the feasibility study, planning and design of railway, high-speed railway, urban railway, light railway, and advanced transportation system.
Especially, we are in turn-key project and private proposal project and promise to be the best safety, comfort, eco-friendliness and competitive design with custom satisfaction as the top priority.

MAJOR SERVICES

Pre-feasibility study and preliminary feasibility study

  • · Alternative routes and location of stations
    · Estimation of cost by alternative
    · Establishment of train operation plan and calculatation of operating cost
    · Estimate of total project cost by alternative
    · Economics and financial feasibility analysis

Feasibility study and basic planning

  • · Route and station planning
    · Calculation of construction cost by alternative
    · Railway facility planning and E&M planning
    · Calculation of total project cost
    · Economic analysis
    · Preliminary environmental review and pre-disaster impact review

Basic design

  • · Basic plan analysis
    · Establishment of design criteria
    · Selection of alternative route considering economic feasibility and constructablity
    · Land survey and ground investigation
    · Earthworks, bridges, tunnels basic design
    · Estimate and adjustment of total project cost

Detailed design

  • · Basic design analysis
    · Land survey, ground investigation
    · Detailed design for earthworks, bridges, tunnels
    · Calculation and adjustment of total project cost
    · Aplication for approval of detailed plan

MAJOR PROJECTS

Basic and detailed design

  • Project name

    Basic and detailed design of the 7th section of the 2nd stage of the Honam high-speed railway

  • Client

    Korea Rail Network Authority, Korea

  • Period

    Nov. 2018. ~ Oct. 2020.

  • Contents

    - Location: Muan-gun, Jeollanam-do ~ Mokpo-si, Jeollanam-do, Korea
    - Total length: 8.332km
      Earthwork 2.552km
      Bridge 2.330km
      Tunnel 3.450km

  • Image

  • Similar project performance

    - Basic design of Cheonan~Cheongju airport 2nd zone
    - Basic design of Wolgot~Pangyo double track railway (section 10)
    - Detailed design of Indeokwon~Dongtan double track railway (section 10)

Feasibility study and basic plan

  • Project name

    Feasibility study and basic plan of Seokmun industrial complex incoming railway

  • Client

    Ministry of Land, Infrastructure and Transport, Korea

  • Period

    Nov. 2019. ~ Apr. 2021.

  • Contents

    - Total length: 31.0km
     Earthwork 21.4km
     Bridge 9.6km
     4 stations

  • Image

  • Similar project performance

    - Basic concept and feasibility study for undergroundization of subway line No.2
    - Feasibility study for location selection of Myeonmok line vehicle base
    - Feasibility review for express and introduction of Bundang line

Preliminary feasibility study

  • Project name

    Preliminary feasibility study for the incoming railway at Saemangeum port

  • Client

    Ministry of Land, Infrastructure and Transport, Korea

  • Period

    May. 2018. ~ Jun. 2019.

  • Contents

    - Total length: 29.5km
     Earthwork 18.4km
     Bridge 10.1km
     5stations (including 2 signal stations)

  • Image

  • Similar project performance

    - Preliminary feasibility study for single track from Gwangju Songjeong to Suncheon
    - Review of the feasibility of Yeoju-Wonju railwayconstruction project
    - Preliminary feasibility study for Chungcheong industrialand cultural railway (boryeong line)

Turn-key

  • Project name

    Construction of Gyeongbu express line safety vulnerable site (Daejeon north connection line) section 1

  • Client

    Korea Rail Network Authority, Korea

  • Period

    Feb. 2020. ~ Jul. 2020.

  • Contents

    - Total length: 3.15km
     Earthwork 0.64km
     Tunnel 2.06km
     Opening 0.45km

  • Image

  • Similar project performance

    - Construction of Dongtan~Indeokwon double track railway (section 9)
    - Construction of Icheon~Mungyeong railway (section 8)
    - Construction of Incheon Metropolitan Railway (Section 210)