HOME KOREAN

COMPANY

BUSINESS

토글 메뉴 닫기

We can change the world

We coexist with nature and seek a mutual growth with people.

Urban railway

Urban railway Department

BUSINESS Urban railway

“Eco-friendly Railway Structures Design with Transportation and Safety of Citizen as Top Priority”

We design future-oriented railway structures in harmony with the surrounding environment, also consider safety and economics as well.
In addition, our qualified experts design to look further than the customer's eye based on the required regulations, advanced technologies and our experiences.

MAJOR SERVICES

Design for turnkey, alternative, private and proposed

  • · Design for bridge and ground structure
    · Underground structure design

Design for bridge and ground structure

  • · Special bridge
    · General railroad, urban railroad, light rail transit bridge
    · Overpass and sidewalk design
    · Design for other structures such as retaining wall, soundproof wall, etc.

Underground structure design

  • · Subway structure design
    · Structure design for ventilation and auxiliary facility
    · Planning and design for structure foundation and temporary facility
    · Underpass design
    · Design for passage and channel box

Maintenance design

  • · Repair and reinforcement design for bridge
    · Disaster prevention facility design
    · Seismic reinforcement design
    · Structure design for subway safety gate and lifting facility
    · Repair and reinforcement design for facility and installation of additional station

MAJOR PROJECTS

Turnkey, Alternative, Private and Proposed Design

  • Project name

    Basic and detailed design for construction of Yeongdong-daero underground complex development (zone 3)

  • Client

    Hyundai E&C, Korea

  • Period

    Jul. 2020. ~ Jan. 2022.

  • Contents

    - Location: From COEX Intersection to Samsung Station Intersection, Seoul-city, Korea
    - Complex transfer center (60m underground, 7th floor)
    - 20m long-distance girder and column plan

  • Image

  • Similar project performance

    - Basic design for the construction of section 1 of the safety vulnerabilities of the Gyeongbu high-speed line (Daejeon north connection line) - Basic and detailed design for the construction of the9th section of the Dongtan-Indeokwon double track - Detailed design for private investment project for metropolitan express railway line A - Detailed design for Icheon-Mungyeong railway construction project (Section 8) - Alternative design for section 6 of Busan metro line 1 extension

Bridge and ground structures design

  • Project name

    Detailed design for the roadbed of Indeokwon-Dongtan double track (section 10)

  • Client

    Korea Rail Network Authority, Korea

  • Period

    May. 2020. ~ Aug. 2021.

  • Contents

    - Location: Yongin-city, Gyeonggi-do ~ Hwaseong-city, Gyeonggi-do, Korea
    - 2 stations (4th basement floor)
    - 1 main ventilation system

  • Image

  • Similar project performance

    - Detailed design of the roadbed for Indeokwon~Dongtan double track, section 7
    - Detailed design of roadbed for Wolgo-Pangyo double track, section 3
    - Basic and detailed design of the roadbed for the 7th section of Honam high-speed railway 2nd stage
    - Basic design of the roadbed for Wolgot-Pangyo double track, section 10
    - Detailed design for the bridge field of Deokha vehicle base in Donghae Nambu line

Maintenance design for the railway structures

  • Project name

    Basic and detailed design service for temporary platform installation for vehicle base of Uijeongbu light rail in attraction line

  • Client

    Woojin Metro Corporation, Korea

  • Period

    Jan. 2020. ~ Sep. 2020.

  • Contents

    - Location: Uijeongbu Light Rail Gosan Vehicle Base, Uijeongbu-city, Gyeonggi-do, Korea
    - 1 Temporary platform
    - Civil engineering, architecture, E&M field 1 set

  • Image

  • Similar project performance

    - Detailed design for extension of the bridges between Dogye and Gosari on the Yeongdong line,
     including Oshipcheon 20st and 4 other places
    - Detailed design for lifting facility installation of 5 stations including Migeum station on the Bundang line
    - Detailed design for installation of bridge inspection facilities in three places including Samtancheon
     between Dongryang and Samtan on the Chungbuk line
    - Detailed design for seismic performance reinforcement of Galwol-gado bridge in Gyeongbu line
    - Feasibility study for the installation of convenience facilities for subway lines 5~8