Construction Management

Construction Management Department

BUSINESS Construction Management

“Enhance the Future Project Value Through Our Reliable Total Consulting”

We are carrying out the feasibility of the project plan from the planning stage to the construction stage and operation stage of the construction field. we also provide economic feasibility and
consulting services for the entire life cycle of the facility based on the value engineering(VE) at the design and construction stages and post evaluation at the completion of the construction.
Our mission is consulting on the value of future construction that customers can trust through the experience and know-how of economical feasibility study accumulated in various projects such as civil engineering, architecture and environment.

MAJOR SERVICES

Economical feasibility review(VE/LCC)

  • · Review the appropriateness of project plan
    · Review of design economics
     - VE review at the basic design and detailed design
     - Turn-key and alternative design, VE/LCC at the private investment project
     - Design review and economic evaluation of the private sector
     - VE at the change of the design in the construction stage
     - CM and VE for the public budget project
     - LCA (Life Cycle Assessment) review
    · Training, consulting and design VE

Post-evaluation of construction step

  • · Schematic evaluation of facilities between 30 billion and 50 billion won
     - Evaluation of construction cost and construction period
    · A comprehensive post-evaluation of over 50 billion won
     - Benefit-cost analysis at the operation stage
      - Survey and environmental assessment

Establishment of maintenance history information and evaluation of actual conditions

  • · Investigation and evaluation by facility of the old class facilities
     - Evaluation of remaining life
     - Determination of necessity of performance improvement
    · Establishment of mid- to long-term management plan

MAJOR PROJECTS

Economic review of design (VE / LCC)

  • Client

    Korea National Fool Cluster, Korea

  • Period

    Dec. 2019. ~ Aug. 2020.

  • Contents

    · Reviewing(VE) economic feasibility of design
    · 81 intermediate design(VE), 77 detailed design(VE)
     - Total of 158 ideas proposed
      Intermediatedesign VE life cycle cost (LCC)
      - Reduced life cycle cost (LCC)
      by 1,106.57million won and detailed design VE 95.79 million won

  • Image

  • Similar project performance

    - Design economic feasibility review (design VE) for expansion of berth facilities in Mosulpo port
    - Review (VE) of economic feasibility of design for access road opening project of Yeongnam general industrial complex
    - Economic feasibility (VE) review of basic and detailed design for expansion of southern public sewage treatment facility
    - Economic review of basic design (design VE) for construction of alternative access road to Mokpo new port

Construction management in the design stage

  • Client

    Anyang-City, Gyeonggi-do, Korea

  • Period

    Jun. 2020. ~ Feb. 2021.

  • Contents

    · Construction management at the design stage
     - Establishment of design supervision plan and confirm design process promotion
    · Review (VE) economic feasibility of design
     - Total of 96 ideas are proposed through basic and detailed design VE
     - Reduction of 25.90 million won in total construction cost

  • Image

  • Similar project performance

    - Construction management of basic and detailed design for modernization of integrated water purification plant in Bisan, Poil
    - Road construction management between Woljeon-dong and Mujin-ro (design stage) and design economic feasibility review (VE)
    - Design supervision and design VE for construction of Songjeong-Mundong 1 and other 4 projects
    - Management and design of 3 construction projects including Cheongyang-Sinpoong road construction

Post-evaluation in construction stage

  • Client

    Incheon International Airport Corporation, Korea

  • Period

    Jun. 2020. ~ Mar. 2021.

  • Contents

    · B/C evaluation
    · Survey of residents and operators
    · Survey of surrounding conditions
    · Calculation of direct and indirect benefits

  • Image

  • Similar project performance

    - Post-evaluation for the 2nd phase construction of subway line 9
    - Post evaluation for advanced treatment and facility modernization at Jungnang water recycling center
    - Post evaluation for construction of Inje speedium
    - Post evaluation for construction of Seoul memorial park (cosmetic facilities)
    - Post evaluation for extension construction of subway line 3
    - Post evaluation for reconstruction of Yeongdeungpo water purification plant and construction of advanced water purification facility