HOME KOREAN

COMPANY

BUSINESS

토글 메뉴 닫기

We can change the world

We coexist with nature and seek a mutual growth with people.

Road Planning & Design

Road Planning & Design Department

BUSINESS Road Planning & Design

“Planning and Design of Smart road Connecting Mind and Heart”

We plan and design various roads including smart highways, smart-urban highways, national roads, and provincial roads considering our future.
Our qualified experts internationally in the field of road design are doing their best to satisfy our customers by considering safety, comfort, environment
and economical feasibility with our advanced technology including smart.

MAJOR SERVICES

Road feasibility study / basic plan

  • · Preliminary feasibility study
    · Route planning and traffic analysis
    · Economic and policy analysis
    · Propose an efficient optimal investment time

Basic and detailed design

  • · Selecting candidate
    · Forecast of future traffic demand, capacity analysis and facility size
    · Selection of optimal route using 3D and BIM
    · Eco-friendly road design
    · Realization of optimal design to secure the best quality

Competitive design(Technical proposal, alternative and Turn-key design)

  • · Creative technology proposal
    · Improving the efficiency of investment costs
    · Realization of roads that improve VE value

Private development

  • · Overcoming the government's investment resources
    · Show off the special technology and creativity of the private sector
    · Efficient road operation

MAJOR PROJECTS

Feasibility study / basic plan

  • Project name

    A feasibility study for the connection between Banghwa tunnel and Olympic highway

  • Client

    Seoul Metropolitan Government, Korea

  • Period

    Mar. 2017. ~ Jun. 2018.

  • Contents

    - Design speed: V=80km/hr
    - Extension: L=1.3km
    - Bridge: L=800m/1 place

  • Image

  • Similar project performance

    - Feasibility and basic plan for connecting roads between east and west
    - Establishment of reorganization plan for sustainable eco-friendly road space
    - Basic plan for urban highway accident risk diagnosis/improvement
    - Feasibility study for Improvement of Northern arterial road
    - Feasibility study for structural improvement of internal circulation route (Wolgok IC)
    - Feasibility study for the expansion of the roundabout road at Shingeumho station
    - Feasibility study for the construction of the connecting road between Ulsan new port and main port

Basic and detailed design

  • Project name

    Detailed design for extension work of Yeongdong expressway (Ansan-Buksuwon) (section 1)

  • Client

    Korea Expressway Corporation, Korea

  • Period

    Dec. 2017. ~ Dec. 2019.

  • Contents

    - Design speed: V=100km/hr
    - Extension: L=7.42km
    - Access facilities: 3 places including Ansan JCT

  • Image

  • Similar project performance

    - Basic design for undergrounding of Dongbu arterial road (section 2)
    - Basic and detail design of road improvement in the international exchange complex (section 3)
    - Detailed design for road construction work in Dongmyeon~Jincheon (section 2)
    - Basic and detail design for generalization of Gyeongin expressway (section 5)
    - Detailed design of road construction from Imsil to Jangsu
    - Basic and detail design for underground roadway and upper park on the national assembly road
    - Detailed design for national road construction work in section 2 of Pohang~Andong 1-1

Competitive design (technology proposal, alternative, TURN-KEY, private investment)

  • Project name

    Technical proposal for the basic design of the underground road of the Dongbu arterial road (from Changdong to Sanggye section)

  • Client

    Seoul Metropolitan Government and another one, Korea

  • Period

    Dec. 2019. ~ Oct. 2020.

  • Contents

    - Design speed: V=80km/hr
    - Extension: L=1.7km
    - Underpass: L=1,356m 1place

  • Image

  • Similar project performance

    - Technical proposal for the underground space complex development of Yeongdong-daero (Section 1)
    - Basic and Detailed Design for Peace Road of Yeongjong~Sindo (Turn-key)
    - Proposal for 3rd party private investment project for undergrounding of Dongbu expressway
    - Turn-key between Songsan green city and Sihwa multi-techno valley
    - Seoul-Sejong Expressway Anseong-Guri (section 12) Turn-key
    - Technical proposal for basic design of Sikman~Sasang (Daejeo Bridge)
    - Technical Proposal for highway route 14 Miryang~ Ulsan (section 1)